About Us    
     
     
     
R02 : Maintenance of Road Shoulder

 
BEFORE   SCOPE OF WORKS
Ro2 : Maintenance of Road Shoulder - Before

1. Patching of Potholes

2. Surface cracking

3. Edge deterioration of backfield trenches

4. Stripping of aggregate

5. Rutting

6. Vegetation on paved surface

7. Deterioration of concrete pavement

8. Deterioration of concrete pavement joints

9. Repair to paving blocks and slabs

 
IN-PROGRESS
Ro2 : Maintenance of Road Shoulder - In Progress
 
AFTER
Ro2 : Maintenance of Road Shoulder - After