Cycle
a. Cleaning Works
i. Protocol roads: 4 cycles/ year
ii. Non-Protocol roads: 2 cycles / year
b. Repainting Works
i. Protocol roads: 2 years/ cycle
ii. Non-Protocol roads: 2 years / cycle
1. Cleaning of guardrails
2. Cleaning of signs and posts
3. Cleaning of delineator post, kilometer post and concrete barriers
4. Cleaning of traffic signal aspects
5. Repainting of guardrail beam
6. Repainting of sign posts and traffic signal posts
7. Repainting of delineator posts and kilometer posts
8. Repainting of existing road kerbs and concrete barriers